Sprocket Networks
Fiber network & coverage map
Owner & operator: Sprocket Networks
→ Build Scorecard (per-phase progress) → Progress Over Time (deduped + reconciliation) → Lasso Footprint (serviceability & coverage) → SprocketPods (candidate DC sites & power) → Stakeholder presentation view
Stakeholder presentation viewFull view ↗
— mi reported complete
of — mi planned (HLD design) · completed is vendor-reported, deduped trackers
Evidence-verified on map—
Vendor-reported, pending as-built—
City target sites
— / — sites conduit passed
0 sites connected — no building drops or lit fiber yet
Conduit passed — Not yet reached —
Stage from proximity to as-built network (evidence-verified).
Map layers
Completed
Field Reported
Reported complete in Ocius‑X / vendor tracker — construction evidence not yet on file.
Permitted
Engineered
Planned (HLD)
96 ct
144 ct
288 ct
432 ct
Other / unresolved
Sizes per splice plan (pending city sign-off). Inventory: 96/144/288/432 only.
1‑Way
2‑Way
4‑Way
7‑Way
Designed fiber plant
Splice cases (planned)
Ring splice
Lateral splice
Tie-in / pass-through
Per Miguel’s splice plan — pending city sign-off. No fiber pulled or spliced yet.
Dallas network Existing Sprocket plant · —
Sub-layers & validation
Handhole (fill = stage color)
Handhole with field photos
Engineered & Permitted mileage = LIT program status. Completed = evidence‑verified. Map lines show geometry digitized so far.
Reconciliation tier
Vendor-reported progressDeduped contractor trackers · by phase
0–33%
34–66%
67–89%
90–100%
Deduped contractor trackers — vendor-reported, not evidence-verified built.
ⓘ Vendor-reported vs evidence-verified — what's the difference?
Field docs owed
— permits claim — ft complete with no redline or as-built on file
Vendor-claimed footage with no redline/as-built submitted — this is why evidence-verified lags.
Provenance — contractor, permit #, agency, and dates — is attached to every feature and included in all exports. Prepared for the City of Fort Worth & NCTCOG.
CONFIDENTIAL & PROPRIETARY. This map and its data are the confidential property of Sprocket Networks, LLC, furnished solely for evaluation by the intended recipient. Not to be copied, distributed, or disclosed without written consent. © 2026 Sprocket Networks, LLC.
Two ways to count "built"

Vendor-reported (this tier) — what the contractors' weekly trackers say is complete, per City permit, with cross-vendor double-counting removed (one permit handed Sunrise→Jacqueline is counted once, not twice). Shown shaded per phase because the permit-to-corridor link only exists for a handful of corridors; we attribute progress at phase level rather than guess which specific segment a permit's footage belongs to.

Evidence-verified built — the crisp green/colored conduit lines, drawn only where a digitized as-built, redline, or bore log confirms the geometry foot-by-foot. This is the slower, harder number and is usually lower than the vendor-reported figure (the gap is the as-built digitization backlog).

Both are shown so the difference is visible, never collapsed into one number. Full reconciliation and the weekly trend: Progress Over Time →

Sprocket Networks
Export map & data
Provenance — contractor, permit #, agency, dates — is attached to every feature and included in all exports.
Build a custom export
Pick the layers, then export a KMZ or a zoomed PDF map with a legend.
Full-network packages
⬇︎ Shapefile ⬇︎ KMZ
⬇︎ Permit schedule (CSV) ⬇︎ Build scorecard (CSV) ⬇︎ Vendor-reported progress (GeoJSON)
CONFIDENTIAL & PROPRIETARY — property of Sprocket Networks, LLC. For the intended recipient's evaluation only. Every export carries this notice.
Latest map updates
Conduit most recently added to the map from digitized redlines & as-builts.
Construction progress — Fort Worth Fiber
Completed network only · Jan 2025 → today
Today
— ⓘ
Field photo